NED: FERC Documents

PROJECT OVERVIEWFERC DOCUMENTS
TOWN BY TOWNRESOLUTIONS OPPOSING
NED NEWS


APPLICATION DOCUMENTS:
» Supplemental Filings in response to FERC – December 30, 2015
» Supplemental Filings in response to FERC – December 28, 2015
» Supplemental Filings – December 21, 2015

»»» NED’s Formal Application with FERC – November 20, 2015


PRE-FILING DOCUMENTS:
» Resource Report & Project Scope Update – July 24, 2015
» RESOURCE REPORTS – March 13, 2015
» SECOND VERSION, RESOURCE REPORT 1 – Dec. 8, 2014
— KM’s FERC filing, contains the new preferred route 12/8/14
» 1st VERSION, RESOURCE REPORTS 1 & 10 – November 4, 2014
— Contains the original preferred route and alternates
» INITIAL PRE-FILING DOCUMENTS, Sept. 15, 2014

» OPEN HOUSE SCHEDULE
»» KEY COMMENTS FILED on NED docket

NED-ProjectLocationMap

Interactive map showing pipeline route and ranges of locations for MA and NH compressor stations.

—— Shape-files of Russ Gaulin’s map above available for download

» KMZ file

» Powerline alternative files

» Laterals files

Screen Shot 2014-12-27 at 8.30.29 PM

» Interactive Google map of the Dec. 8 “preferred route”

Highly useful tool for searching specific path locations. The individual breakdown of the laterals is more visible if you look to the menu on the left and turn off the layer named “FERC 20141208 v3”.

Screen Shot 2015-01-15 at 4.26.09 PM

» Interactive map with ruler! Based on same KM maps as those above, but with a ruler that lets you measure distance between the pipeline route and other landmarks. Compressor station range of locations show in light blue on the line.

Key dates as Kinder Morgan pursues its Northeast Energy Direct natural gas pipeline project:

March: First draft of environmental review due at the Federal Energy Regulatory Commission (FERC).

June: Updated, revised environmental review document to be filed.

September: Official application filing expected, including final environmental review.

Oct. 2016: Application decision from FERC anticipated.

Jan. 2017: If approved, tree removal along route begins.

April 2017: First phase of construction starts.

April 2018: Final phase of construction starts.

Nov. 2018: Pipeline ready to go online.


OTHER RELATED DOCUMENTS

» Kinder Morgan’s preferred timeline

» MA EEA position on KM permission to survey state lands

» How to use the FERC website to view and file comments

Save